Construction and Extension of the Electric Substations in Honduras
Empresa Nacional de Energía Eléctrica (ENEE, by its acronyms in Spanish) invites the elegible suppliers to present sealed offers for the design, supply, transportation, montage, tests and civil works of all the contemplated equipment for the project that consists in the Construction and Extension of the Electric Substations in Honduras, specifically of Progreso and Toncontin 230 – 138 kv.
The works will be located in the City of El Progreso, Municipality of El Progreso, Yoro Department, and in the City of Comayagüela, Municipality of Central District, Francisco Morazán Department.
The substations contemplate:
Substation Progreso
- Supply and installation of one (1) new autotransformer with a power of 150 mva in 230/138 kv.
- Supply and installation of three switches with its associated equipment of measurement and isolators for the construction of a complete bay.
- Civil works like a control cable channel, inside road, control room, foundations for the mayor and minor equipment, rain drainage and other requirements.
Substation Toncontin
- Supply and installation of one (1) new autotransformer with a power of 150 mva in 230/138 kv.
- Civil works for a control cable channel, surveillance booth, foundations for the mayor and minor equipment, rain drainage and other requirements.
- Supply and installation of a switch and its associated equipment like isolators, transformers of measurements, bar holder, fittings and miscellaneous accessories for the connection in the side of 138 kv to the existent busbar (B-535).
The offers may be received until November 7th, 2017 at 2:30 p.m.
Estimated cost of investment: N/A