The National Electric Energy Company of Honduras tenders works for the supply and installation of the structures in a 69 kv line section of the L-424 circuit, between the Danlí and Chichicaste substations, and a 34.5kv line section of the L358 circuit, located in San Nicolás Copán.

The works to be carried out are:

  • Dismantling of structures
  • Removal of bare 266.8MCM ACSR conductor
  • Removal of guard wire
  • Removal of concrete posts 55 feet high of 1200lbs
  • Transfer to Danli Substation of all materials and hardware recovered from the project
  • Installation of new structures
  • 266.8MCM conductor installation
  • Relocation of existing driver
  • Installation of self-supporting concrete posts
  • Foundation works for self-supporting concrete posts
  • General cleaning
  • Miscellaneous testing, receipt, and operation

Estimated cost of investment: N/A

Deadline for the submission of bids: December 1, 2020