loader image

Investment Project

Renovation of El Cajón Hydroelectric Plant in Honduras

The overall objective of the program is to enhance and recover the role of the Francisco Morazán hydroelectric plant (CHFM) as an effective asset to provide flexibility and integration of variable renewable energy (VRE) into the Honduran electricity system.

The specific objectives are:

  • Improve the reliability and operational efficiency of the plant as an asset to increase the participation of ERVs in the National Interconnected System (NIS).
  • Integrate the CHFM to the System Operator (SO).
  • Develop studies to evaluate the increase of its generation capacity

Estimated investment amount: USD 36,827,000.00

Deadline for the submission of bids: N/A

Ricardo Duarte Jiménez
Partner
García & Bodán
Honduras

Compartir