García & Bodán

Works on power lines in Honduras

The National Electric Energy Company of Honduras tenders works for the supply and installation of the structures in a 69 kv line section of the L-424 circuit, between the Danlí and Chichicaste substations, and a 34.5kv line section of the L358 circuit, located in San Nicolás Copán.

The works to be carried out are:

Estimated cost of investment: N/A

Deadline for the submission of bids: December 1, 2020

Ricardo Duarte Jiménez
Partner
García & Bodán