The implementing organism, Inversión Estratégica de Honduras (INVEST-H) invites the different suppliers to participate on the rehabilitation works of Road CA-3 in Honduras, road that leads to the south of the country. The rehabilitation works are divided in two lots:
- Lot A: Choluteca–San Bernardo detour (Est. 0+000 a 20+055) with a longitude of 20.055 km.
- Lot B: San Bernardo–Guasaule (Est. 20+055 a 41+704) with a longitude of 1.084 km.
Basically it will be built an exclusive road for light and heavy vehicles that enter customs from Nicaragua. The works include, among others, cleaning of the right of way, common excavation, the recycling of the current carpet and the placement of asphalt layer with density between 10 and 11 c, placement of sewers with steel reinforced concrete. Also, it will made the horizontal and vertical signaling along the sector, pedestrian bridges and bus bays, implementation of an environmental and social management plan and their mitigation measurements.
It is necessary the presentation of Maintenance Guarantee of the Offer distributed as follows:
- Lot A: USD 400,000.00
- Lot B: USD 400,000.00
- Both lots: USD 800,000.00
Estimated cost of investment: N/A