{"id":9845,"date":"2019-05-31T10:45:10","date_gmt":"2019-05-31T08:45:10","guid":{"rendered":"https:\/\/garciabodan.com\/?p=9845"},"modified":"2025-08-11T19:57:54","modified_gmt":"2025-08-11T17:57:54","slug":"construction-in-joya-de-ceren-archaeological-park-in-el-salvador","status":"publish","type":"post","link":"https:\/\/garciabodan.com\/en\/construction-in-joya-de-ceren-archaeological-park-in-el-salvador\/","title":{"rendered":"Construction in Joya de Cer\u00e9n Archaeological Park in El Salvador"},"content":{"rendered":"The construction of self-supporting roofs for Joya de Cer\u00e9n Archaeological Park is a comprehensive project aimed at both natural and legal persons.\n\nSaid project requires technical construction services that includes, among other things, the stroke of each Archaeological complex and the definitive lines corresponding to the constructive elements; excavation for foundation under the archaeological level released; filled with ground cement without compacting, depth of three meters; filled with uncompact natural soil to the archaeological level released; mounting of protection structures; all the labor, materials, equipment and services necessary for the supply, delivery and installation of any work of plumbing and evacuation of rainwater, according to the hydraulic planes; the supply and installation of secondary electricity laying, among other things.\n\nThe period of execution of the project will be of one hundred eighty calendar days, being able to be said period extended in conformity to the LACAP.\n\nThe project will take place in the archaeological complexes number 1, 2 and 3 of Joya de Cer\u00e9n Archaeological Park, San Juan Opico, La Libertad.\n\nDeadline for the submission of bids: June 10<sup>th<\/sup>, 2019\n\nEstimated cost of investment: N\/A\n\n<img decoding=\"async\" class=\"size-full wp-image-9848 alignleft\" src=\"https:\/\/garciabodan.com\/wp-content\/uploads\/2019\/05\/Julio-Vargas-020615-1.jpg\" alt=\"\" width=\"150\" height=\"170\" \/><a href=\"https:\/\/garciabodan.com\/en\/?p=3434\">Julio Vargas Solano<\/a>\nManaging Partner\nGarc\u00eda &amp; Bod\u00e1n\nEl Salvador","protected":false},"excerpt":{"rendered":"<p>The construction of self-supporting roofs for Joya de Cer\u00e9n Archaeological Park is a comprehensive project aimed at both natural and legal persons.<\/p>\n","protected":false},"author":10,"featured_media":9846,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[82],"tags":[],"class_list":["post-9845","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/9845","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/comments?post=9845"}],"version-history":[{"count":1,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/9845\/revisions"}],"predecessor-version":[{"id":39845,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/9845\/revisions\/39845"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/media\/9846"}],"wp:attachment":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/media?parent=9845"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/categories?post=9845"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/tags?post=9845"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}