{"id":9432,"date":"2019-03-30T11:30:30","date_gmt":"2019-03-30T10:30:30","guid":{"rendered":"https:\/\/garciabodan.com\/?p=9432"},"modified":"2025-08-11T19:57:48","modified_gmt":"2025-08-11T17:57:48","slug":"international-tender-electrical-works-in-nicaragua","status":"publish","type":"post","link":"https:\/\/garciabodan.com\/en\/international-tender-electrical-works-in-nicaragua\/","title":{"rendered":"International Tender: Electrical Works in Nicaragua"},"content":{"rendered":"Empresa Nacional de Transmisi\u00f3n El\u00e9ctrica bids electrical works in Nicaragua with the construction of networks and installation of primary distribution networks in different regions of the country.\n\n&#8220;The contract consists of the construction of Primary and Secondary Distribution Networks in 72 energy areas with 1,230 projects; distributed in the Managua Sector with 43 projects, Western Sector with 16 projects, Southern Sector with 10 projects, Northern Sector with 3 projects, grouped in six (6) lots respectively.\n\nThe works will be carried out applying the Construction Manual PRES V2, Standard Project Type Standard ENEL 1998 in Medium and Low Networks for 7.6\/13.2 kV and 14.4\/24.9 kV and Installation of the Second and\/or Third Generation Bi- Body Measurement with AMI (Advanced Metering Infrastructure) technology.\n\nThese projects consist of the construction of Efficient and Sustainable Medium and Low Voltage Networks, with installation of transformers, bi-body meters and connections in 72 energy areas distributed in 65 municipalities in the sectors of Managua, West, South and North&#8221;.\n\nEstimated cost of investment: N\/A\n\nDeadline for submission of bids: May 9th, 2019.\n\n<img decoding=\"async\" class=\"size-full wp-image-9435 alignleft\" src=\"https:\/\/garciabodan.com\/wp-content\/uploads\/2019\/03\/Federico-Gurdi\u00e1n.-080914-3.jpg\" alt=\"\" width=\"150\" height=\"170\" \/><a href=\"https:\/\/garciabodan.com\/en\/?p=3531\">Federico A. Gurdi\u00e1n Sacasa<\/a>\nManaging Partner\nGarc\u00eda &amp; Bod\u00e1n\nNicaragua","protected":false},"excerpt":{"rendered":"<p>Empresa Nacional de Transmisi\u00f3n El\u00e9ctrica bids electrical works in Nicaragua with the construction of networks and installation of primary distribution networks in different regions of the country.<\/p>\n","protected":false},"author":10,"featured_media":9433,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[82],"tags":[],"class_list":["post-9432","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/9432","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/comments?post=9432"}],"version-history":[{"count":1,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/9432\/revisions"}],"predecessor-version":[{"id":39822,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/9432\/revisions\/39822"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/media\/9433"}],"wp:attachment":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/media?parent=9432"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/categories?post=9432"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/tags?post=9432"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}