{"id":9065,"date":"2019-01-30T10:51:10","date_gmt":"2019-01-30T09:51:10","guid":{"rendered":"https:\/\/garciabodan.com\/?p=9065"},"modified":"2025-08-11T19:57:37","modified_gmt":"2025-08-11T17:57:37","slug":"works-of-rehabilitation-and-improvement-of-road-ca-6-in-honduras","status":"publish","type":"post","link":"https:\/\/garciabodan.com\/en\/works-of-rehabilitation-and-improvement-of-road-ca-6-in-honduras\/","title":{"rendered":"Works of rehabilitation and improvement of Road CA-6 in Honduras"},"content":{"rendered":"The project consists in making works of rehabilitation and improvement of Road CA-6, Tranche III, Neteapa-Danl\u00ed, located in the department of El Para\u00edso; and it comprehends:\n<ul>\n \t<li>Batch A: Station 64+240 \u2013 Station 74+240 L = 10.00 km<\/li>\n \t<li>Batch B: Station 74+240 \u2013 Station 89+160 L = 14.92 km<\/li>\n<\/ul>\nThe works consists, among others, in the cleansing of the right of way (clearing and weeding), relocation of public services (optical fiber, energy, potable water, etc.); common excavation, rock excavation, additional carrying; in paving the works will consist in recycling and stabilization with cement of the existent structure, granular base stabilized with 20cm thickness cement, supplying and colocation of cement; drainage works, supplying and installation of drainage pipes of 24\u201d to 42\u201d; complementary works as sidewalks, booths for bus stops; road signs that includes horizontal and vertical signage; works of environmental mitigation, considerations for special provisions, delegated administration, and recognitions of higher costs.\n\nDeadline for the submission of bids: March 4<sup>th<\/sup>, 2019\n\nEstimated cost of investment: N\/A\n\n<img decoding=\"async\" class=\"size-full wp-image-9069 alignleft\" src=\"https:\/\/garciabodan.com\/wp-content\/uploads\/2019\/01\/Ricardo-Duarte-161115-5.jpg\" alt=\"\" width=\"150\" height=\"170\" \/><a href=\"https:\/\/garciabodan.com\/en\/?p=3508\">Ricardo Duarte Jim\u00e9nez<\/a>\nPartner\nGarc\u00eda &amp; Bod\u00e1n\nHonduras","protected":false},"excerpt":{"rendered":"<p>The project consists in making works of rehabilitation and improvement of Road CA-6, Tranche III, Neteapa-Danl\u00ed, in the department of El Para\u00edso, Honduras.<\/p>\n","protected":false},"author":10,"featured_media":9066,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[82],"tags":[],"class_list":["post-9065","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/9065","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/comments?post=9065"}],"version-history":[{"count":1,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/9065\/revisions"}],"predecessor-version":[{"id":39784,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/9065\/revisions\/39784"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/media\/9066"}],"wp:attachment":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/media?parent=9065"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/categories?post=9065"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/tags?post=9065"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}