{"id":6152,"date":"2017-12-28T07:21:41","date_gmt":"2017-12-28T06:21:41","guid":{"rendered":"https:\/\/garciabodan.com\/?p=6152"},"modified":"2025-08-11T19:55:51","modified_gmt":"2025-08-11T17:55:51","slug":"extension-of-passenger-terminal-of-international-airport-of-el-salvador","status":"publish","type":"post","link":"https:\/\/garciabodan.com\/en\/extension-of-passenger-terminal-of-international-airport-of-el-salvador\/","title":{"rendered":"Extension of Passenger Terminal of International Airport of El Salvador"},"content":{"rendered":"The Executive Autonomous Port Commission, through its Institutional Acquisitions and Contracting Unit (UACI, by its acronyms in Spanish), promotes the open tender for the extension of passenger terminal of International Airport of El Salvador \u201cMonse\u00f1or Arnulfo Romero y Gald\u00e1mez\u201d, stage 1.\n\nThe documents that have to be presented are:\n<ul>\n \t<li>Legal documents<\/li>\n \t<li>Financial documents<\/li>\n \t<li>Technical documents<\/li>\n<\/ul>\nPart of the extension includes:\n<ul>\n \t<li>Disassembly of the false ceiling of metal staves (includes the mobilization for delivery inside the airport installations)<\/li>\n \t<li>Disassembly of the emergency door<\/li>\n \t<li>Demolition and eviction of the marble floor<\/li>\n \t<li>Demolition of the pavement<\/li>\n \t<li>Blocks of concrete walls of 20x20x40<\/li>\n \t<li>Fine-tuning of concrete columns<\/li>\n<\/ul>\nThe participant will present in favor of CEPA an Offer Maintenance Guarantee, for a million one hundred thousand dollars (USD 1,100,000.00), with a validity of one hundred twenty (120) calendar days.\n\nEstimated cost of investment: N\/A\n\n<img decoding=\"async\" class=\"size-full wp-image-4907 alignleft\" src=\"https:\/\/garciabodan.com\/wp-content\/uploads\/2017\/06\/Julio-Vargas-020615.jpg\" alt=\"\" width=\"150\" height=\"170\" \/><a href=\"https:\/\/garciabodan.com\/en\/profiles\/julio-cesar-vargas-solano\/\">Julio Vargas Solano<\/a>\nManaging Partner\nGarc\u00eda &amp; Bod\u00e1n\nEl Salvador","protected":false},"excerpt":{"rendered":"<p>The Executive Autonomous Port Commission, through its Institutional Acquisitions and Contracting Unit (UACI, by its acronyms in Spanish), promotes the open tender for the extension of passenger terminal of International Airport of El Salvador.<\/p>\n","protected":false},"author":10,"featured_media":6149,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[82],"tags":[],"class_list":["post-6152","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/6152","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/comments?post=6152"}],"version-history":[{"count":1,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/6152\/revisions"}],"predecessor-version":[{"id":39398,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/6152\/revisions\/39398"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/media\/6149"}],"wp:attachment":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/media?parent=6152"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/categories?post=6152"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/tags?post=6152"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}