{"id":4786,"date":"2017-07-28T14:47:21","date_gmt":"2017-07-28T12:47:21","guid":{"rendered":"https:\/\/garciabodan.com\/?p=4786\/"},"modified":"2025-08-11T19:55:08","modified_gmt":"2025-08-11T17:55:08","slug":"expansion-and-improvement-of-road-ca-5-north-in-honduras","status":"publish","type":"post","link":"https:\/\/garciabodan.com\/en\/expansion-and-improvement-of-road-ca-5-north-in-honduras\/","title":{"rendered":"Expansion and Improvement of Road CA-5 North in Honduras"},"content":{"rendered":"Direcci\u00f3n General de Carreteras (DGC) invites to present proposals for the public international tender for the project Expansion and Improvement of Road CA-5 North in Honduras.\n\nThe project covers the section Las Mercedes\u2013Empalme Villa de San Antonio, located in the Comayagua. Also, it covers the stations 57+644 y 62+439, having an <span style=\"background: white;\">approximate length<\/span> of 4.8 km.\n\nThe construction contemplates the expansion of the existent road of two lanes, one each way. These will be separated by a median of 1.20 meters. In the intern sides of the road will be built canals of 1.20 meters with a variable depth. On the other hand, on the outside will be built sidewalks of 1.20 meters, plus a green area fringe; in which it is planned the pipe fitting of public services.\n\nAlso, it has been contemplated two returns (u-bend), in the stations 1+602 and 3+329. Finally, the pavement structure will be constituted of an asphalt concrete layer of 10cm and a stabilized base layer with cement of 25 cm.\n\nThe main objective of this project is that the works to be built are in accordance and that generates an adequate connectivity between the adjacent sections and the ones that will be in construction.\n\nEstimated cost of investment: N\/A\n\n<img decoding=\"async\" class=\"size-full wp-image-1878 alignleft\" src=\"https:\/\/garciabodan.com\/wp-content\/uploads\/2016\/10\/Ricardo-Duarte.jpg\" alt=\"Ricardo Alfredo Duarte Jim\u00e9nez\" width=\"150\" height=\"170\" \/>\n\n<a href=\"https:\/\/garciabodan.com\/en\/profiles\/ricardo-alfredo-duarte-jimenez\/\">Ricardo Duarte Jim\u00e9nez<\/a>\nPartner\nGarc\u00eda &amp; Bod\u00e1n\nHonduras","protected":false},"excerpt":{"rendered":"<p>Direcci\u00f3n General de Carreteras (DGC) invites to present proposals for the public international tender for the project Expansion and Improvement of Road CA-5 North in Honduras.<\/p>\n","protected":false},"author":10,"featured_media":4784,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[82],"tags":[],"class_list":["post-4786","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/4786","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/comments?post=4786"}],"version-history":[{"count":1,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/4786\/revisions"}],"predecessor-version":[{"id":39245,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/4786\/revisions\/39245"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/media\/4784"}],"wp:attachment":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/media?parent=4786"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/categories?post=4786"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/tags?post=4786"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}