{"id":46495,"date":"2026-10-13T11:33:46","date_gmt":"2026-10-13T17:33:46","guid":{"rendered":"https:\/\/garciabodan.com\/?p=46495"},"modified":"2026-10-13T17:55:55","modified_gmt":"2026-10-13T23:55:55","slug":"guatemala-launches-peg-6-2026-open-tender-to-procure-600-mw-of-capacity-and-energy","status":"publish","type":"post","link":"https:\/\/garciabodan.com\/en\/guatemala-launches-peg-6-2026-open-tender-to-procure-600-mw-of-capacity-and-energy\/","title":{"rendered":"Guatemala launches PEG-6-2026 Open Tender to procure 600 MW of capacity and energy"},"content":{"rendered":"<p>The Government of Guatemala has officially launched the <strong>PEG-6-2026 Open Tender<\/strong>, a strategic process to procure <strong>600 MW of electric capacity and energy<\/strong> aimed at ensuring the continuity and reliability of the country&#8217;s electricity supply.<\/p>\r\n<p>The tender is being conducted by <strong>EEGSA, DEORSA, and DEOCSA<\/strong>, with the support of the <strong>National Electric Energy Commission (CNEE),<\/strong> pursuant to CNEE Resolution No. 323-2026.<\/p>\r\n<p>&nbsp;<\/p>\r\n<p>&nbsp;<\/p>\r\n<p>&nbsp;<\/p>\r\n<p>&nbsp;<\/p>\r\n<h2><span style=\"color: #2263aa;\">What does PEG-6 include?<\/span><\/h2>\r\n<p>The 600 MW will be divided into two blocks:<\/p>\r\n<ul>\r\n\t<li><strong>Block A of 450 MW:<\/strong> allocated to new generation plants.<\/li>\r\n\t<li><strong>Block B of 150 MW:<\/strong> allocated to currently operating power plants.<\/li>\r\n\t<li><strong>Up to 15 years:<\/strong> term of the supply agreements.<\/li>\r\n\t<li><strong>May 1, 2032:<\/strong> scheduled start date for electricity supply.<\/li>\r\n<\/ul>\r\n<p>The tender seeks to incorporate <strong>firm capacity<\/strong>, meaning generation capacity that helps ensure reliable electricity supply regardless of weather conditions.<\/p>\r\n<p>&nbsp;<\/p>\r\n<h2><span style=\"color: #2263aa;\">Economic and contractual considerations<\/span><\/h2>\r\n<p>For the economic evaluation of bids, the tender documents establish reference prices for different fuels, based on the sources and methodologies specified in the tender documentation:<\/p>\r\n<p>&nbsp;<\/p>\r\n<table style=\"height: 144px; width: 100%; border-collapse: collapse; border-style: dashed;\">\r\n<tbody>\r\n<tr style=\"border-style: double; background-color: #09004d;\">\r\n<td style=\"width: 56.6666%; border-style: double; height: 24px; text-align: center;\"><strong><span style=\"color: #ffffff;\">Fuel<\/span><\/strong><\/td>\r\n<td style=\"width: 19.596%; border-style: double; height: 24px; text-align: center;\"><strong><span style=\"color: #ffffff;\">Reference price<\/span><\/strong><\/td>\r\n<td style=\"width: 23.7373%; border-style: double; height: 24px; text-align: center;\"><strong><span style=\"color: #ffffff;\">Unit<\/span><\/strong><\/td>\r\n<\/tr>\r\n<tr style=\"border-style: double;\">\r\n<td style=\"width: 56.6666%; border-style: double; height: 24px;\">Bunker fuel \u2013 US Gulf No. 6 (USGC HSFO)<\/td>\r\n<td style=\"width: 19.596%; border-style: double; height: 24px;\">US $78.68<\/td>\r\n<td style=\"width: 23.7373%; border-style: double; height: 24px;\">US$\/BBL<\/td>\r\n<\/tr>\r\n<tr style=\"border-style: double;\">\r\n<td style=\"width: 56.6666%; border-style: double; height: 24px;\">Coal \u2013 FOB Colombia 6000 NAR<\/td>\r\n<td style=\"width: 19.596%; border-style: double; height: 24px;\">US $91.71<\/td>\r\n<td style=\"width: 23.7373%; border-style: double; height: 24px;\">US$\/MT<\/td>\r\n<\/tr>\r\n<tr style=\"border-style: double;\">\r\n<td style=\"width: 56.6666%; border-style: double; height: 24px;\"><span class=\"TextRun SCXW170183449 BCX0\" lang=\"ES-SV\" xml:lang=\"ES-SV\" data-contrast=\"auto\"><span class=\"NormalTextRun SpellingErrorV2Themed SCXW170183449 BCX0\">Petroleum<\/span> <span class=\"NormalTextRun SpellingErrorV2Themed SCXW170183449 BCX0\">coke<\/span><\/span><span class=\"TextRun SCXW170183449 BCX0\" lang=\"ES-SV\" xml:lang=\"ES-SV\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW170183449 BCX0\"> \u2013 USGC <\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW170183449 BCX0\">Petcoke<\/span><span class=\"NormalTextRun SCXW170183449 BCX0\"> High-<\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW170183449 BCX0\">Sulphur<\/span><span class=\"NormalTextRun SCXW170183449 BCX0\"> FOB 7,500 kc NAR<\/span><\/span><span class=\"EOP Selected SCXW170183449 BCX0\" data-ccp-props=\"{}\">\u00a0<\/span><\/td>\r\n<td style=\"width: 19.596%; border-style: double; height: 24px;\">US $102.72<\/td>\r\n<td style=\"width: 23.7373%; border-style: double; height: 24px;\">US$\/MT<\/td>\r\n<\/tr>\r\n<tr style=\"border-style: double;\">\r\n<td style=\"width: 56.6666%; border-style: double; height: 24px;\">Natural gas \u2013 Henry Hub<\/td>\r\n<td style=\"width: 19.596%; border-style: double; height: 24px;\">US $2.57<\/td>\r\n<td style=\"width: 23.7373%; border-style: double; height: 24px;\">US$\/MMBTU<\/td>\r\n<\/tr>\r\n<tr style=\"border-style: double;\">\r\n<td style=\"width: 56.6666%; border-style: double; height: 24px;\">Propane \u2013 Mont Belvieu<\/td>\r\n<td style=\"width: 19.596%; border-style: double; height: 24px;\">US $0.686<\/td>\r\n<td style=\"width: 23.7373%; border-style: double; height: 24px;\">US$\/gallon<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<p>&nbsp;<\/p>\r\n<p>The reference prices are based on specialized sources, including <strong>Platts, US Marketscan, Coal Trader International, McCloskey, and OPIS,<\/strong> as applicable to each fuel.<\/p>\r\n<p>The <strong>natural gas and propane<\/strong> prices were calculated based on the corresponding average values for <strong>June, July, and August 2026.<\/strong><\/p>\r\n<p>&nbsp;<\/p>\r\n<h2><span style=\"color: #2263aa;\">Financial commitments<\/span><\/h2>\r\n<ul>\r\n\t<li><strong>Bid security:<\/strong> each bidder must provide a guarantee equivalent to <strong>US $30,000 for each MW<\/strong> <strong>of maximum Guaranteed Capacity offered.<\/strong><\/li>\r\n\t<li><strong>Pre-operational Guarantee:<\/strong> each awarded bidder must provide a guarantee equivalent to <strong>US $100,000 for each MW of Guaranteed Capacity awarded.<\/strong> This guarantee must remain in effect until two months after the corresponding validation by the <strong>Wholesale Market Administrator (AMM).<\/strong><\/li>\r\n<\/ul>\r\n<p>&nbsp;<\/p>\r\n<h2><span style=\"color: #2263aa;\">Contract type by generation technology<\/span><\/h2>\r\n<p>The tender documents also distinguish the applicable contractual mechanism based on the generation technology:<\/p>\r\n<ul>\r\n\t<li><strong>Renewable generation plants:<\/strong> may use either a Load Curve Contract for Differences or an Energy Purchase Option Contract.<\/li>\r\n\t<li><strong>Non-renewable generation plants:<\/strong> must use an Energy Purchase Option Contract.<\/li>\r\n<\/ul>\r\n<p>In addition, the distribution companies may sell surplus capacity and energy in the Wholesale Market or the Regional Electricity Market (MER), in accordance with applicable regulations.<\/p>\r\n<p>&nbsp;<\/p>\r\n<h2><span style=\"color: #2263aa;\">Tender schedule<\/span><\/h2>\r\n<h2>\u00a0<\/h2>\r\n<table style=\"height: 202px; width: 100%; border-collapse: collapse; border-style: dashed;\">\r\n<tbody>\r\n<tr style=\"border-style: double; background-color: #09004d;\">\r\n<td style=\"width: 33.3333%; border-style: double; height: 24px; text-align: center;\"><strong><span style=\"color: #ffffff;\">Event<\/span><\/strong><\/td>\r\n<td style=\"width: 33.3333%; border-style: double; height: 24px; text-align: center;\"><strong><span style=\"color: #ffffff;\">Date<\/span><\/strong><\/td>\r\n<\/tr>\r\n<tr style=\"border-style: double;\">\r\n<td style=\"width: 33.3333%; border-style: double; height: 24px;\">Availability of tender documents<\/td>\r\n<td style=\"width: 33.3333%; border-style: double; height: 24px;\">Starting October 6, 2026<\/td>\r\n<\/tr>\r\n<tr style=\"border-style: double;\">\r\n<td style=\"width: 33.3333%; border-style: double; height: 10px;\">Requests for clarification<\/td>\r\n<td style=\"width: 33.3333%; border-style: double; height: 10px;\">March 4, 2027<\/td>\r\n<\/tr>\r\n<tr style=\"border-style: double;\">\r\n<td style=\"width: 33.3333%; border-style: double; height: 24px;\">Responses and addenda<\/td>\r\n<td style=\"width: 33.3333%; border-style: double; height: 24px;\">March 18, 2027<\/td>\r\n<\/tr>\r\n<tr style=\"border-style: double;\">\r\n<td style=\"width: 33.3333%; border-style: double; height: 24px;\">Submission and opening of technical bids<\/td>\r\n<td style=\"width: 33.3333%; border-style: double; height: 24px;\">April 6, 2027<\/td>\r\n<\/tr>\r\n<tr style=\"border-style: double;\">\r\n<td style=\"width: 33.3333%; border-style: double; height: 24px;\">Economic evaluation<\/td>\r\n<td style=\"width: 33.3333%; border-style: double; height: 24px;\">April 22, 2027<\/td>\r\n<\/tr>\r\n<tr style=\"border-style: double;\">\r\n<td style=\"width: 33.3333%; border-style: double; height: 24px;\">Award<\/td>\r\n<td style=\"width: 33.3333%; border-style: double; height: 24px;\">May 6, 2027<\/td>\r\n<\/tr>\r\n<tr style=\"border-style: double;\">\r\n<td style=\"width: 33.3333%; border-style: double; height: 24px;\">Execution of agreements<\/td>\r\n<td style=\"width: 33.3333%; border-style: double; height: 24px;\">Within 3 months after the award<\/td>\r\n<\/tr>\r\n<tr style=\"border-style: double;\">\r\n<td style=\"width: 33.3333%; border-style: double; height: 24px;\">Start of supply<\/td>\r\n<td style=\"width: 33.3333%; border-style: double; height: 24px;\">May 1, 2032<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<p>&nbsp;<\/p>\r\n<p>The tender documents cost US $25,000, and the process will include a digital platform for participant registration, access to information, submission of inquiries, responses, and monitoring of the different stages of the tender.<\/p>","protected":false},"excerpt":{"rendered":"<p>The Government of Guatemala has officially launched the PEG-6-2026 Open&#8230;<\/p>\n","protected":false},"author":3,"featured_media":46505,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[228],"tags":[416,250],"class_list":["post-46495","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tender","tag-energy","tag-guatemala-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/46495","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/comments?post=46495"}],"version-history":[{"count":9,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/46495\/revisions"}],"predecessor-version":[{"id":46527,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/46495\/revisions\/46527"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/media\/46505"}],"wp:attachment":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/media?parent=46495"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/categories?post=46495"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/tags?post=46495"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}