{"id":13484,"date":"2020-10-30T18:40:23","date_gmt":"2020-10-30T17:40:23","guid":{"rendered":"https:\/\/garciabodan.com\/?p=13484"},"modified":"2025-08-11T19:59:22","modified_gmt":"2025-08-11T17:59:22","slug":"works-on-power-lines-in-honduras","status":"publish","type":"post","link":"https:\/\/garciabodan.com\/en\/works-on-power-lines-in-honduras\/","title":{"rendered":"Works on power lines in Honduras"},"content":{"rendered":"The National Electric Energy Company of Honduras tenders works for the supply and installation of the structures in a 69 kv line section of the L-424 circuit, between the Danl\u00ed and Chichicaste substations, and a 34.5kv line section of the L358 circuit, located in San Nicol\u00e1s Cop\u00e1n.\n\nThe works to be carried out are:\n<ul>\n \t<li>Dismantling of structures<\/li>\n \t<li>Removal of bare 266.8MCM ACSR conductor<\/li>\n \t<li>Removal of guard wire<\/li>\n \t<li>Removal of concrete posts 55 feet high of 1200lbs<\/li>\n \t<li>Transfer to Danli Substation of all materials and hardware recovered from the project<\/li>\n \t<li>Installation of new structures<\/li>\n \t<li>266.8MCM conductor installation<\/li>\n \t<li>Relocation of existing driver<\/li>\n \t<li>Installation of self-supporting concrete posts<\/li>\n \t<li>Foundation works for self-supporting concrete posts<\/li>\n \t<li>General cleaning<\/li>\n \t<li>Miscellaneous testing, receipt, and operation<\/li>\n<\/ul>\nEstimated cost of investment: N\/A\n\nDeadline for the submission of bids: December 1, 2020\n\n<img decoding=\"async\" class=\"size-full wp-image-13487 alignleft\" src=\"https:\/\/garciabodan.com\/wp-content\/uploads\/2020\/10\/Ricardo-Duarte.-260820-3.png\" alt=\"\" width=\"150\" height=\"170\" \/><a href=\"https:\/\/garciabodan.com\/en\/?p=3508\">Ricardo Duarte Jim\u00e9nez<\/a>\nPartner\nGarc\u00eda &amp; Bod\u00e1n\nHonduras","protected":false},"excerpt":{"rendered":"<p>The National Electric Energy Company of Honduras tenders works for the supply and installation of power lines between the Danl\u00ed and Chichicaste substations, and San Nicol\u00e1s Cop\u00e1n.<\/p>\n","protected":false},"author":10,"featured_media":13485,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[82],"tags":[],"class_list":["post-13484","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/13484","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/comments?post=13484"}],"version-history":[{"count":1,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/13484\/revisions"}],"predecessor-version":[{"id":40154,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/13484\/revisions\/40154"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/media\/13485"}],"wp:attachment":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/media?parent=13484"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/categories?post=13484"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/tags?post=13484"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}