{"id":10540,"date":"2019-10-02T11:28:06","date_gmt":"2019-10-02T17:28:06","guid":{"rendered":"https:\/\/garciabodan.com\/?p=10540"},"modified":"2025-08-11T19:58:14","modified_gmt":"2025-08-11T17:58:14","slug":"construction-for-bypass-projects-in-el-salvador","status":"publish","type":"post","link":"https:\/\/garciabodan.com\/en\/construction-for-bypass-projects-in-el-salvador\/","title":{"rendered":"Construction for bypass projects in El Salvador"},"content":{"rendered":"Construction for bypass projects in El Salvador, between the Santa Ana highway and the Sonsonate highway, includes sampling, testing, inspection, and comprehensive management of the quality of the design and work performed, in which the bidder must provide a technical bid that includes a statement of working methods, equipment, personnel, programs, and other information.\n\nThe project area is located in the department of La Libertad, in the central zone of El Salvador, at a distance of approximately 28 km from San Salvador and surrounding four municipalities: San Juan Opico, Ciudad Arce, Col\u00f3n and Sacacoyo.\n\nThe project is funded by the United States, through the Millennium Challenge Corporation (MCC), and is open to all bidders from eligible countries, as defined in the Bidding Documents. The bid must be accompanied by a Bid Performance Bond in the form and amount indicated on the BDS.\n\nDeadline for the submission of bids: October 25<sup>th<\/sup>, 2019\n\nEstimated cost of investment: N\/A\n\n<img decoding=\"async\" class=\"size-full wp-image-10543 alignleft\" src=\"https:\/\/garciabodan.com\/wp-content\/uploads\/2019\/10\/Julio-Vargas-020615-1.jpg\" alt=\"\" width=\"150\" height=\"170\" \/><a href=\"https:\/\/garciabodan.com\/en\/?p=3434\">Julio C. Vargas Solano<\/a>\nManaging Partner\nGarc\u00eda &amp; Bod\u00e1n\nEl Salvador","protected":false},"excerpt":{"rendered":"<p>Construction for bypass projects in El Salvador, between the Santa Ana highway and the Sonsonate highway, includes sampling, testing, inspection, and comprehensive management of the quality of the design and work performed.<\/p>\n","protected":false},"author":10,"featured_media":10541,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[82],"tags":[],"class_list":["post-10540","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/10540","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/comments?post=10540"}],"version-history":[{"count":1,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/10540\/revisions"}],"predecessor-version":[{"id":39910,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/posts\/10540\/revisions\/39910"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/media\/10541"}],"wp:attachment":[{"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/media?parent=10540"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/categories?post=10540"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/garciabodan.com\/en\/wp-json\/wp\/v2\/tags?post=10540"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}