The project consists in making works of rehabilitation and improvement of Road CA-6, Tranche III, Neteapa-Danlí, located in the department of El Paraíso; and it comprehends:
- Batch A: Station 64+240 – Station 74+240 L = 10.00 km
- Batch B: Station 74+240 – Station 89+160 L = 14.92 km
The works consists, among others, in the cleansing of the right of way (clearing and weeding), relocation of public services (optical fiber, energy, potable water, etc.); common excavation, rock excavation, additional carrying; in paving the works will consist in recycling and stabilization with cement of the existent structure, granular base stabilized with 20cm thickness cement, supplying and colocation of cement; drainage works, supplying and installation of drainage pipes of 24” to 42”; complementary works as sidewalks, booths for bus stops; road signs that includes horizontal and vertical signage; works of environmental mitigation, considerations for special provisions, delegated administration, and recognitions of higher costs.
Deadline for the submission of bids: March 4th, 2019
Estimated cost of investment: N/A
Partner
García & Bodán
Honduras